Regensburg 2004 – scientific programme
Parts | Days | Selection | Search | Downloads | Help
TT: Tiefe Temperaturen
TT 8: Postersitzung I: Supraleitung
TT 8.5: Poster
Monday, March 8, 2004, 14:30–19:00, Poster A
High magnetic field test facilities at the Forschungszentrum Karlsruhe — •Hanno Leibrock, Frank Hornung, Marion Kläser, Hans Müller, Astrid Rimikis, and Theo Schneider — Institut für Technische Physik, Forschungszentrum Karlsruhe GmbH, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen
Since more than 20 years the high-field laboratory (HFL) of the Institute for Technical Physics at the Forschungszentrum Karlsruhe develops, constructs and operates superconducting high-field magnets. During this period we achieved, inter alia, the world record of 20.1 Tesla for a superconducting magnet system (HOMER 1, 1987) and introduced the world’s first commercial 750 MHz, 800 MHz and 900 MHz NMR-spectrometer, together with our industrial partner Bruker Biospin.
Current tasks of the HFL-group is the construction of the HOMER II test facility with magnetic fields up to 25 Tesla and a national BMBF-project for the development of a 1000 MHz NMR-spectrometer (23.5 Tesla) together with Bruker Biospin.
Two experimental facilities, JUMBO (max. 15 Tesla) and HOMER I (max. 20.1 Tesla) exist in the high field laboratory for the required investigations in high magnetic fields. The first construction stage of the third facility, HOMER II, with a magnetic field of 20 Tesla in a bore of 180 mm diameter will start up soon. All setups, based on advanced superconducting magnets, are presented in this contribution.