DPG Phi
Verhandlungen
Verhandlungen
DPG

Dresden 2014 – scientific programme

Parts | Days | Selection | Search | Updates | Downloads | Help

BE: Beschleunigerphysik

BE 7: Synchrotron Radiation I

BE 7.2: Talk

Wednesday, April 2, 2014, 10:00–10:15, MOL 213

Analysis of Coupled Bunch Instabilities in BESSYVSR — •Martin Ruprecht1, Paul Goslawski1, Andreas Jankowiak1, Markus Ries1, Godehard Wüstefeld1, and Thomas Weis21Helmholtz-Zentrum Berlin, Germany — 2Technische Universität Dortmund, Germany

BESSYVSR, a scheme where 1.5 ps and 15 ps long bunches (rms) can be stored simultaneously in the BESSY II storage ring has recently been proposed [1]. The strong longitudinal bunch focusing is achieved by superconducting high gradient RF cavities. This paper presents investigations of coupled bunch instabilities driven by higher order modes (HOMs) of superconducting multi cell cavities in BESSYVSR. Analytical calculations and tracking simulations in time domain are performed in the longitudinal and the transverse planes and factors that influence the threshold currents are being discussed. Possible candidates of suitable cavity designs are investigated.

[1] G. Wüstefeld, A. Jankowiak, J. Knobloch, M. Ries, Simultaneous Long and Short Electron Bunches in the BESSY II Storage Ring, Proceedings of IPAC2011, San Sebastián, Spain

100% | Mobile Layout | Deutsche Version | Contact/Imprint/Privacy
DPG-Physik > DPG-Verhandlungen > 2014 > Dresden