Berlin 2015 –
scientific programme
AKE 15: Energy Systems (joint session DY/ AKE /SOE)
Thursday, March 19, 2015, 09:30–12:45, BH-N 243
|
09:30 |
AKE 15.1 |
Decentral Smart Grid Control — •Benjamin Schäfer, Moritz Matthiae, Dirk Witthaut, and Marc Timme
|
|
|
|
09:45 |
AKE 15.2 |
Dynamical Models of Power Grids: Identifying and Curing Weak Links — •Martin Rohden and Hildegard Meyer-Ortmanns
|
|
|
|
10:00 |
AKE 15.3 |
The induced feedback of Demand-Side Management in the German power market and grid — •Sabine Auer, Jobst Heitzig, and Jürgen Kurths
|
|
|
|
10:15 |
AKE 15.4 |
Flow tracing in renewable electricity networks — Mirko Schäfer, •Bo Tranberg, and Martin Greiner
|
|
|
|
10:30 |
AKE 15.5 |
Large-deviation study of the maximum-disturbance stability of power grids — •Alexander K. Hartmann, Timo Dewenter, Wiebke Heins, and Benjamin Werther
|
|
|
|
10:45 |
AKE 15.6 |
Impact of network topology on decentral frequency-based smart grid control — •Carsten Grabow and Jürgen Kurths
|
|
|
|
11:00 |
|
15 min. break
|
|
|
|
11:15 |
AKE 15.7 |
Detours around basin stability in power networks — •Paul Schultz, Jobst Heitzig, and Jürgen Kurths
|
|
|
|
11:30 |
AKE 15.8 |
Network Measures for Power Grid Stability in Practice — •Frank Hellmann
|
|
|
|
11:45 |
AKE 15.9 |
Predicting critical links in complex supply networks — •Xiaozhu Zhang, Dirk Witthaut, Martin Rohden, Sarah Hallerberg, and Marc Timme
|
|
|
|
12:00 |
AKE 15.10 |
Modelling the Dynamical Formation of Coalitions of Power Grid Operators to Reduce Needs for Backup Capacity — •Jobst Heitzig and Sarah Becker
|
|
|
|
12:15 |
AKE 15.11 |
Short-Time Stochastic Characterization of the Offshore Wind Profile — •Christian Behnken, Pedro Lind, Matthias Wächter, and Joachim Peinke
|
|
|
|
12:30 |
AKE 15.12 |
Intermittency and Synchronization in Wind Farm — •Mehrnaz Anvari and Joachim Peinke
|
|
|