Wuppertal 2015 –
wissenschaftliches Programm
AKBP 12: Beam Diagnosis
Donnerstag, 12. März 2015, 13:45–16:15, BZ.08.06 (HS 1)
|
13:45 |
AKBP 12.1 |
First Tests of the New LHC K-Modulation Tool in the SPS — •Maria Kuhn
|
|
|
|
14:00 |
AKBP 12.2 |
Visible Light Diagnostics at the ANKA Storage Ring — •Benjamin Kehrer, Edmund Hertle, Nicole Hiller, Michael Holz, Anke-Susanne Müller, Patrik Schönfeldt, and Paul Schütze
|
|
|
|
14:15 |
AKBP 12.3 |
A Fast Gated Intensified Camera Setup for Transversal Beam Diagnostics at the ANKA Storage Ring — •Paul Schütze, Edmund Hertle, Nicole Hiller, Benjamin Kehrer, Anke-Susanne Müller, and Patrik Schönfeldt
|
|
|
|
14:30 |
AKBP 12.4 |
Development of new Beam Position Monitors at COSY — •Fabian Hinder for the JEDI collaboration
|
|
|
|
14:45 |
AKBP 12.5 |
Beam Induced Fluorescence (BIF) monitor development — •Yulia Shutko, Dieter Hoffmann, Peter Forck, Beata Walasek-Höhne, Thomas Sieber, and Serban Udrea
|
|
|
|
15:00 |
AKBP 12.6 |
Microwave Radiation Studies with a LNB Detector System — •Matthias Martin, Marcel Schuh, Johannes Steinmann, and Anke-Susanne Müller
|
|
|
|
15:15 |
AKBP 12.7 |
Preserving 3D beam information in one streak camera measurement* — •Michael Switka and Wolfgang Hillert
|
|
|
|
15:30 |
AKBP 12.8 |
Considerations for a Wakefield-Optimized Near-Field EO Setup at the ANKA Storage Ring — •Patrik Schönfeldt, Nicole Hiller, Benjamin Kehrer, and Anke-Susanne Müller
|
|
|
|
15:45 |
AKBP 12.9 |
Aufbau eines optischen Messsystems zur Untersuchung von Halo- und Dunkelstrom in GunLab — •Jens Völker, Thorsten Kamps und Andreas Jankowiak
|
|
|
|
16:00 |
AKBP 12.10 |
Upgrade of the profile monitors in the injection beam line of COSY — •Karl Reimers and Vsevolod Kamerdzhiev
|
|
|