Wuppertal 2015 – wissenschaftliches Programm
Bereiche | Tage | Auswahl | Suche | Aktualisierungen | Downloads | Hilfe
AKBP: Arbeitskreis Beschleunigerphysik
AKBP 15: Beam Dynamics / Simulation III
AKBP 15.3: Vortrag
Donnerstag, 12. März 2015, 17:15–17:30, F.10.01 (HS 4)
Influence of Transient Beam Loading on the Longitudinal Beam Dynamics at BESSY VSR — •Martin Ruprecht1, Paul Goslawski1, Andreas Jankowiak1, Markus Ries1, Godehard Wüstefeld1, and Thomas Weis2 — 1Helmholtz-Zentrum Berlin, Germany — 2Technische Universität Dortmund, Germany
BESSY VSR, a scheme where 1.5 ps and 15 ps long bunches (rms) can be stored simultaneously in the BESSY II storage ring has recently been proposed[1]. The strong longitudinal bunch focusing is achieved by superconducting high gradient RF cavities. If the fill pattern exhibits a significant inhomogeneity, e.g. due to gaps, transient beam loading causes a distortion of the longitudinal phase space which is different for each bunch. The result are variations along the fill pattern in synchronous phase, synchrotron frequency and bunch shape. This paper presents investigations of transient beam loading and depicts the consequences on bunch length, phase stability and longitudinal multi-bunch oscillations for the projected setup of BESSY VSR.
[1] G. Wüstefeld, A. Jankowiak, J. Knobloch, M. Ries, Simultaneous Long and Short Electron Bunches in the BESSY II Storage Ring, Proceedings of IPAC2011, San Sebastián, Spain