Bereiche | Tage | Auswahl | Suche | Aktualisierungen | Downloads | Hilfe
HK: Fachverband Physik der Hadronen und Kerne
HK 69: Instrumentation XIX
HK 69.1: Gruppenbericht
Freitag, 18. März 2016, 14:00–14:30, S1/01 A2
Development of a high rate TPC - The ALICE TPC upgrade after LS2 — •Markus Ball for the ALICE collaboration — Rheinische Friedrich-Wilhelms-Universität Bonn
The ALICE (A Large Ion Collider Experiment at CERN) collaboration plans an upgrade of the detector system during the second long shutdown of the LHC, during which the interaction rate will be increased to 50 kHz for Pb-Pb collisions. This demands operation of the Time Projection Chamber (TPC) in an ungated continuous mode. A conventional gating grid can not be used to prevent ions drifting back into the drift volume. Micro Pattern Gaseous Detectors (MPGD) such as GEMs and Micromegas offer suppression of the ion backflow. To keep distortions due to space-charge at a tolerable level an ion yield of 10 to 20 back drifting ions per incoming electron is required. However, the need for low ion backflow might be in conflict to other key parameters such as the detector performance and stability of the system. Therefore a careful optimisation of all three requirements was needed.
Furthermore the large scale capability of the system has to be guaranteed. Test beams have been carried out to study the large scale performance with an Inner Readout Chamber (IROC) equipped with a multiple GEM system. Also an quadruple GEM Outer Readout Chamber (OROC) was assembled and successfully operated being the largest detector of this type. The upgrade of all readout chambers with a quadruple GEM system has started in 2016. The strategy and the work flow of the TPC upgrade will be presented