Die DPG-Frühjahrstagung in Dresden musste abgesagt werden! Lesen Sie mehr ...
Bereiche | Tage | Auswahl | Suche | Aktualisierungen | Downloads | Hilfe
AKBP: Arbeitskreis Beschleunigerphysik
AKBP 7: Diagnostics, Control and Instrumentation
AKBP 7.5: Vortrag
Dienstag, 17. März 2020, 15:30–15:45, MOL 213
Optimization of RF Synchronization with the FLUTE Timing System — •Thiemo Schmelzer1, Michael J. Nasse2, Marcel Schuh2, Nigel Smale2, and Anke-Susanne Müller1,2 — 1LAS, KIT, Karlsruhe — 2IBPT, KIT, Karlsruhe
FLUTE (Ferninfrarot Linac- Und Test-Experiment) is a new compact versatile linear accelerator at KIT. Its primary goal is to serve as a platform for a variety of accelerator studies as well as to generate strong ultra-short THz pulses for photon science. Trigger signals with several frequencies are needed at FLUTE for devices as well as for sampling or as synchronization references. The trigger generation was revised to optimize the power stability for the RF system, which will be presented in this contribution.