|
16:15 |
T 67.1 |
Group Report:
DT upgrade activities during LHC long shutdown II and readiness status for Run 3 — •Archana Sharma, Thomas Hebbeker, Kerstin Hoepfner, Hans Reithler, Markus Merschmeyer, and Dmitry Eliseev
|
|
|
|
16:35 |
T 67.2 |
A tester tool for the new read-out electronics of the MDT detectors of the ATLAS muon spectrometer in the Phase-II upgrade — •Thorben Swirski, Gia Khoriauli, and Raimund Ströhmer
|
|
|
|
16:50 |
T 67.3 |
Group Report:
The small-diameter Drift Tube (sMDT) Chambers for ATLAS at High-Luminosity LHC and for Future Colliders — Davide Cieri, Gregor Eberwein, Oliver Kortner, Hubert Kroha, Patrick Rieck, Marian Rendel, and •Elena Voevodina
|
|
|
|
17:10 |
T 67.4 |
Quality Control in the Construction of new small-diameter Muon Drift Tube (sMDT) Chambers for the ATLAS Muon Spectrometer at the HL-LHC — •Daniel Buchin, Marian Rendel, Alice Reed, Patrick Rieck, Oliver Kortner, and Hubert Kroha
|
|
|
|
17:25 |
T 67.5 |
Construction of small-diameter Monitored Drift Tube (sMDT) chambers for the ATLAS Muonspectrometer at the HL-LHC — •Marian Rendel, Daniel Buchin, Alice Reed, Oliver Kortner, Hubert Kroha, Patrick Rieck, and Elena Voevodina
|
|
|
|
17:40 |
T 67.6 |
Measuring the geometry of the new small-diameter Monitored Drift Tube (sMDT) chambers constructed for the HL-LHC upgrade of the ATLAS Muonspectrometer — •Alice Reed, Daniel Buchin, Marian Rendel, Patrick Rieck, Elena Voevodina, Oliver Kortner, and Hubert Kroha
|
|
|
|
17:55 |
T 67.7 |
Fabrication of Resitive Plate Chambers — Oliver Kortner, Hubert Kroha, Daniel Soyk, and •Timur Turkovic
|
|
|
|
18:10 |
T 67.8 |
A first look at CMS gas electron multiplier data and certification — Thomas Hebbeker, Kerstin Hoepfner, Francesco Ivone, and •Shawn Zaleski
|
|
|
|
18:25 |
T 67.9 |
The CMS Muon upgrade and the commissioning of the first GEM station — •Francesco Ivone, Thomas Hebbeker, Kerstin Hoepfner, Giovanni Mocellin, and Shawn Zaleski
|
|
|